Planning a mioty network starts from the message profile rather than from coverage: how many devices, how often each reports, and what payload. From that follows the required capacity, and from the site geography and building construction follows the number and placement of base stations. A radio survey validates the plan for the specific location. Because the topology is a star, planning concerns base station placement rather than mesh routing. Several mioty Alliance members can support with professional network planning services if needed.

